It turned out bad ass. I could not have asked for more out of Matt. All I had to do was call and order the material over the phone and even then Matt found me a killer coupon and I saved 30% on the material alone. This was a substantial savings and it still cost me $530 out the door in just material. I was pushing $700 pre-coupon. After that all I had to do was go pick it up when it was done. He went and picked everything up and built it in an extremely timely manner. Thanks for the recommendation sosoe. I wound up going with 2" square tubing with .250" walls throughout and a 3/8" thick top plate. The size is 30 x 96 x 36 and its a beast, I am sure it weighs in the 500-600lbs neighborhood. I have just been cleaning all of the preservative off of the underside and painting it the last couple of days. I will get it turned over tomorrow I am hoping and clean and paint the top side. Here it is so far....
Announcement
Collapse
No announcement yet.
I need a steel table built.
Collapse
X
Comment