Also Buz, it likely is plaster and will have lats under it. That shit is heavy as hell and a significant bitch to remove. We filled a huge roll off with it in Tulsa and it busted the sidewalks getting it hauled off. Also remember that you have to have a ramp to wheelbarrow into the roll off, or you have to lift every ounce of that stuff. Usually 2-3 times the work a first timer estimates it to be.
One time was enough for me, and it was less than 1000 sq ft before we added on.