So this is probably the 3rd time this bike has been worked on to get her running again. This time around I'm going a little more in depth but I should have it back on the road in time to ride it down to the Pie Run as long as the state gets back to me in time for my bonded title.
checked over the brake calipers and installed new pads. Took the carbs down and they are good to go. Installed a new clutch cable that made it in today too. And got the new pingel fuel valve in to replace the useless stock Vacuum operated valve.
Now just to wait for the rest of the parts.
what it should look like. I still need to get some stripes added to the tank but the tail end still has the skunk getup going on. Right now the tank is just black. Now I just need the stache and that sweet hat.
checked over the brake calipers and installed new pads. Took the carbs down and they are good to go. Installed a new clutch cable that made it in today too. And got the new pingel fuel valve in to replace the useless stock Vacuum operated valve.
Now just to wait for the rest of the parts.
what it should look like. I still need to get some stripes added to the tank but the tail end still has the skunk getup going on. Right now the tank is just black. Now I just need the stache and that sweet hat.
Comment