Seems like forever but I've been working on getting enough dirt to build up my house pad. I just spoke with a soils engineer and he suggested something that I haven't done.
To give a little info about the site... the length of the pad is 110ft x 80ft. At the front, it's level on undisturbed soil. The rear has almost 5 feet of back fill that's been run over with a skid steer to build up the first 13 loads of dirt, then I had another 30 loads dumped on top of it, ran over with a skid steer, then end dumps ran over it while dropping another 40 loads, then a bull dozer ran over it to spread the rest. I'm planning to add piers, provided I'm not sitting on water, which I don't think I am.
Long story short, while speaking with the soil engineer, he said they usually recommend digging out the pad site and then building it all back up evenly so that if the soil does settle once the house is built, it's likely to settle evenly.
I've been told that piers is a good investment, especially with the backfill I have. My question is which is better... going with piers or digging it all up and building it up evenly? At this point, I don't know if digging it all up and starting over would be cost effective. The pad is essentially done but the question still remains.
If anyone has any feedback, it would be greatly appreciated.
To give a little info about the site... the length of the pad is 110ft x 80ft. At the front, it's level on undisturbed soil. The rear has almost 5 feet of back fill that's been run over with a skid steer to build up the first 13 loads of dirt, then I had another 30 loads dumped on top of it, ran over with a skid steer, then end dumps ran over it while dropping another 40 loads, then a bull dozer ran over it to spread the rest. I'm planning to add piers, provided I'm not sitting on water, which I don't think I am.
Long story short, while speaking with the soil engineer, he said they usually recommend digging out the pad site and then building it all back up evenly so that if the soil does settle once the house is built, it's likely to settle evenly.
I've been told that piers is a good investment, especially with the backfill I have. My question is which is better... going with piers or digging it all up and building it up evenly? At this point, I don't know if digging it all up and starting over would be cost effective. The pad is essentially done but the question still remains.
If anyone has any feedback, it would be greatly appreciated.