Ripped all of it out down to the studs and was going to put in a 2" shower drain with piping but I would probably have to cut the rebar as well as a few inches of the concrete to get to the beginning of the pipe, anyway around it?
If I dont cut it the top of the drain is 4" off the bottom of the floor around it. The johnbridge forum said i should cut it like its no big deal
If I dont cut it the top of the drain is 4" off the bottom of the floor around it. The johnbridge forum said i should cut it like its no big deal
Comment