I wouldnt be thrilled about 14ga wire either...but its manageable, just dont go crazy on a single circuit. Did they seal the base plate to the slab? Looks like it...if they didnt, you should. Also, just double check all the wiring and make sure the outlets are where you want them. Also...have cat6 run to all the rooms
Announcement
Collapse
No announcement yet.
New house in Melissa
Collapse
X
-
I know of a house that the electrians just recently put up to 17 outlets on each circuit. I would check yours because the inspector wont even look. I think code is 10.
Also they had all the garage plugs on the same circuit. Make sure they are split so you can use more that one power tool at a time or a battery charger.2015 F250 Platinum
Comment
-
Originally posted by mustngacman View PostYou might want to check the laminated beams where the a/c duct is ran through them. Looks like they have cut most of the beam out.Originally posted by LeahBest balls I've had in my mouth in a while.
Comment
-
Originally posted by mustngacman View PostNever seen them take out so much. All the Laminate beams I have worked with was not more than a 3" hole in center from 2x4 to 2x4. But this is in Apartments. Just seems odd that they would be able to cut that much out.
Comment
-
How can y'all tell it's 14ga? Good eyes, I guess. I was out there this morning for a walk through and counted the total number of 110V for outlets and lights at qty. 121. There are a total of (12) 110V feeds going into the panel. I can't confirm how many are on each one, but that's an avg. of (10) for each circuit.
Yes, they sealed the base plate to the slab. I had data drops put in the living room, study, media room, game room, master BR, garage and one of the upstairs bedrooms.
Originally posted by 8mpg View PostI wouldnt be thrilled about 14ga wire either...but its manageable, just dont go crazy on a single circuit. Did they seal the base plate to the slab? Looks like it...if they didnt, you should. Also, just double check all the wiring and make sure the outlets are where you want them. Also...have cat6 run to all the rooms
Comment
-
Originally posted by Doug Hatton View PostThe whole house is wired up using 1 200A panel. There are 6 more GFCI 120v circuits and 3 220v. Today they're adding 4 more 120v for some canned lighting and 3 more 220v for the garage. It'll be done after that. Sheetrock going up next!
Just make sure things are sealed up well around windows, any jack stud to king stud joints, baseplate to slab, corner studs, etc. You REALLY want to do your best on air sealing now before sheetrock goes up. I would make sure all the wiring holes in the headers (and studs if you can) are foamed to seal attic are from the walls. Air sealing can save you 25% on your heating/cooling and is really best to try and do before drywall. Much harder after. it will only cost you $20-30 in materials and a couple hours of work.
couple videos on air sealing:
this one is overkill and you wont use the product but shows lots of places to try and air seal.
Really like this guys videos and he has been a great go to when remodeling my own house:
Last edited by 8mpg; 09-02-2014, 08:03 PM.
Comment
-
They've got orange foam insulation all over the place where they went around and sealed penetrations through the tyvek, through the headers, around windows, etc. The house is an Energy Star certified home and has gone through the inspection for that already. Below is a link to all of the things they look at.
As far as the electrical, it's been inspected as well. It may not be ideal, but there's not much I can do about it now. Perhaps I would have made some revisions if I knew beforehand, but I'm sure it'll be ok. If it trips breakers doing fairly common, frequent tasks, I'll get them to come fix it!