Anyone done this before?
My front walk as it meets the curb is about 2inches lower than it is further back.
Any rain/wash/soil collects here during weather and just looks like shit.
I'd like to raise the edge up and level the panel out so its smooth, and evidently mudjacking (injecting concrete under pressure) underneath will do it.
Its a single panel, about 4'x4' nad maybe 3-4 inches thick. think it'd be more expensive to re pour it.
My front walk as it meets the curb is about 2inches lower than it is further back.
Any rain/wash/soil collects here during weather and just looks like shit.
I'd like to raise the edge up and level the panel out so its smooth, and evidently mudjacking (injecting concrete under pressure) underneath will do it.
Its a single panel, about 4'x4' nad maybe 3-4 inches thick. think it'd be more expensive to re pour it.
Comment