I need a approx underground 1/2" polyethylene gas line run for a fire pit with risers on each end (no final connections needed). The distance is approx 50ft. Right now it is a clear shot, but I will be laying flatwork over a lot of it in a week or 2.
All labor must be performed TO CODE. .
1) Dig Trench
2) lay pipe with sleeve, etc, per code
3) cover line with risers above ground
Anybody need some side work?
All labor must be performed TO CODE. .
1) Dig Trench
2) lay pipe with sleeve, etc, per code
3) cover line with risers above ground
Anybody need some side work?
Comment