For some reason we just can not get enough of a beating...and decided to rip out our upstairs bathroom and replace it as well before carpet goes in upstairs.
If you have noticed..
Here is our overall house progress thread, inside this contains our staircase remodel, half bath remodel, and removal of all popcorn ceilings and replace with knockdown!
http://www.dfwmustangs.net/forums/sh...ad.php?t=21529
This thread is our master bath downstairs remodel from start to finish...need finished pictures still too though!
http://www.dfwmustangs.net/forums/sh...ad.php?t=51548
Well now we have done this...
Would love a break! maybe after this one!
Just want to run my tile idea by some "pros" on here before I start. The floor is not perfectly level..so i am thinking y starting with a slight bit of self leveling filler for the bad spots!
then flex bond thin set
http://www.homedepot.com/p/Custom-Bu...FB50/100122448
then some sort of flex underlayment(not sure of the name the rubber type stuff...home depot has it)
then more flexbond then the tile
SO option A is
from the bottom up
self level the floor, the areas that need it
flexbond
underlayment
flexbond
tile
Or would it just be easier to do option B
Option B
1/2 cement board across whole floor
flexbond
tile
Anyone done either or or have other advise?
If you have noticed..
Here is our overall house progress thread, inside this contains our staircase remodel, half bath remodel, and removal of all popcorn ceilings and replace with knockdown!
http://www.dfwmustangs.net/forums/sh...ad.php?t=21529
This thread is our master bath downstairs remodel from start to finish...need finished pictures still too though!
http://www.dfwmustangs.net/forums/sh...ad.php?t=51548
Well now we have done this...
Would love a break! maybe after this one!
Just want to run my tile idea by some "pros" on here before I start. The floor is not perfectly level..so i am thinking y starting with a slight bit of self leveling filler for the bad spots!
then flex bond thin set
http://www.homedepot.com/p/Custom-Bu...FB50/100122448
then some sort of flex underlayment(not sure of the name the rubber type stuff...home depot has it)
then more flexbond then the tile
SO option A is
from the bottom up
self level the floor, the areas that need it
flexbond
underlayment
flexbond
tile
Or would it just be easier to do option B
Option B
1/2 cement board across whole floor
flexbond
tile
Anyone done either or or have other advise?
Comment