    You making a garden first?

    Comment


    • #17
      Cool man , just finishing up my build now.
      07 GT500
      05 SRT10
      88 turbocoupe T-bird
      93 Cobra
      86 coupe
      Ducati 848

      Comment


      • #18
        Originally posted by Cooter View Post
        Mine's going to be IN the shop... 4ksqft house, 4ksqft shop space
        2100 sq ft house w/ 600+ sq ft car port, full length porches front and back.

        I will have a small shop in back.

        Comment


        • #19
          Originally posted by abecx View Post
          You making a garden first?
          Gotta pay the bills

          Comment


          • #20
            Congrats. The only thing I'd change is move the position of the house 10ft to the left and angle it 3 degrees to the right.

            Comment


            • #21

              Roughing in plumbing today and tomorrow. Pouring the concrete Monday!

              Comment


              • #22
                That's it? That looks like it's going to be a really thin foundation. When my house in TX was built, it was dug down much, much deeper.

                Comment


                • #23
                  foundation and wood would be my 2 important things if I ever custom built a house. I want that thing to last for generations not crack in half after 50 years.

                  Comment


                  • #24
                    Slab is around 8 inches deep, I thought 8-10 was pretty standard?

                    Comment


                    • #25
                      they already pour footings?

                      Comment


                      • #26
                        Originally posted by Droppedlime View Post
                        Slab is around 8 inches deep, I thought 8-10 was pretty standard?
                        it all depends on your soil. Most people here are used to heavy clay soils where you need deep footings or peirs (3-6' deep) to keep the foundation from shifting. If you have a very sandy soil or low clay content like up north, you can lay a traditional slab right on top of the dirt without deep footings.

                        Did you have a soil sample done?

                        Comment


                        • #27
                          Where's the steel, cables, footings, plastic, and trenches? That pad looks real low to me. I'm guessing they shot plenty of grades around there and there's absolutely no chance of standing water? Is that slab engineered by someone who has a stamp?

                          Comment


                          • #28
                            All the cable, Poly, etc are going down tomorrow and prob Saturday. The grade is fine, I am still going to do a little dirt work in the front yard. Soil is a sandy loam,no Clay to be had until deep.The crew still has 3 work days before pouring, I know they have a lot to do before then.

                            Comment


                            • #29
                              Good. There's at least a few days of work left.

                              Comment


                              • #30
                                When I build next year, our house pad will be similar. Its all sandy loam until 14' down. The geotech engineer recommended slab on grade with a post tensioned slab. He specifucally said for no peirs to be used
                                Last edited by 8mpg; 11-08-2012, 09:11 AM.

                                Comment